ABB Limited Articles

Displaying 61 - 64 of 64
Analysis
22nd October 2009
ABB to supply drive systems for Copper Mountain project in British Columbia

ABB, the leading power and automation technology group, earlier this year was awarded a contract valued over $19 million by Copper Mountain Mining Corp., to deliver energy efficient drive systems for the Copper Mountain Mining project in Canada. The order was booked during the first quarter of 2009. Located in Southern British Columbia, the Copper Mountain mine had produced 1.7 billion pounds of copper before it closed in 1996. Copper Mountain i...

Analysis
24th July 2009
ABB provides major national media client with comprehensive electronic control

ABB has been working with Mardix, the largest independent switchboard builder in the UK, to provide electrical control for a major UK media client. The project sees ABB providing all control and distribution equipment for Mardix switchgear being installed on site. The switchgear being installed includes a variety of Uninterruptible Power Supply (UPS) backup and generator supply switchboards, sub-mechanical switchboards, final distribution boards ...

Analysis
29th October 2007
Knight Warner becomes new robotics partner to ABB

Knight Warner, an automation systems integrator that lists Nestle Purina, Corus and TetraPak amongst its clients, has joined ABB’s Robotic Partner Network. The company, formed almost nine years ago, provides bespoke automated systems for different industries including the food industry and the cement and steel industries.

Enclosures
24th October 2007
Mains board reduces delivery times for panelbuilders

ABB claims to be reducing the time it takes to specify and assemble mains distribution boards, with the launch of its Triline-R enclosure range. With availability to the complete ABB product range, Triline-R will reduce delivery times down to 7 to 15 working days.

First Previous Page 4 of 4 Next Last