COQOS Supports Xilinx Zynq
Establishing design centre for sub 5 Watt DC-DC converters prompts Murata Power Solutions to move UK office
Finding Your Dream Job with the Continental Career App

Establishing design centre for sub 5 Watt DC-DC converters prompts Murata Power Solutions to move UK office

Murata today announced that Murata Power Solutions’ UK operations have moved to a new facility within Milton Keynes. With an increasing focus on building a centre of design excellence for low power DC-DC converters, the company is keen to attract power design engineers to join them.

The previous site suited manufacturing and distribution operations that no longer take place in Milton Keynes, so the search was conducted within the local area to locate a facility that better met the requirements of a design and prototype manufacturing operation.

We are proud of our continued presence in Milton Keynes, comments Tasuo Bizen, CEO and President, Murata Power Solutions Our company history has its origins back 60 years when the first pulse transformers were made by Newport Instruments. The Milton Keynes design centre complements the 5 other design locations across Canada, United States, China and Japan each having a specific product development focus. We look forward to writing the next chapter of Murata’s presence in Milton Keynes, UK.

In addition to having vacancies for power design engineers, Murata Power Solutions is proud of the success of its apprenticeship programme. Young people join the company and spend time in each department prior to finding their niche, a number becoming electronics engineers.

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use
Previous Post

COQOS Supports Xilinx Zynq

Next Post

Finding Your Dream Job with the Continental Career App