Rugged industrial box PC with 4G/LTE configuration

Posted By : Alex Lynn
Rugged industrial box PC with 4G/LTE configuration

Industrial communications are constantly evolving and enterprises today require optimised solutions and lower maintenance complexity to lead in the competition. To meet the market demand, Lanner further strengthens its industrial-grade box PC product line-up by adding LEC-3034 series.

The newly added fanless box PC series features dual-core Intel Atom E3825, optional 4G LTE mobile connectivity, DDR3L SO-DIMM memory up to 8GB, mSATA socket, VGA display, wide operating temperature, DIN Rail/Wall-mounting options, and a variety of isolated protected serial COM and LAN configurations for various industrial IoT applications.

LEC-3034 series is powered by Intel Atom E3825 CPU, a dual-core SoC architecture (formerly ‘Bay Trail’) for optimised performance and power consumption in compact computing systems. With onboard M.2 3042 expansion slot with SIM, LEC-3034 supports 4G-LTE mobile connectivity option, which provides more flexibility and scalability for industrial communications in critical infrastructures. Along with support of DDR3L memory and Intel HD Graphics engine, LEC-3034 series meets the market by functioning as a reliable and robust hardware solution for industrial applications.

Different from traditional DB-9 design, LEC-3034 series comes with Phoenix Contact terminal blocks to offer high density and variety of COM port setting based on the ordered models. LEC-3034 series deliver four to eight Serial ports with RS-232/422/485 signals. With 2KV digital isolation and 15KV ESD protection, the Serial ports are well-protected in harsh environments.

Aside from the multiple serial ports, LEC-3034 also features flexible I/O functionality, including two or four GbE LAN ports, two to four USB ports, one mSATA mini slot and a VGA display output.

Regarding environmental ruggedness, LEC-3034 can withstand -40 to +70°C operating temperatures. For mounting installation, the system can be mounted by DIN Rail or wall-mounting.

Downloads


You must be logged in to comment

Write a comment

No comments




Sign up to view our publications

Sign up

Sign up to view our downloads

Sign up

AMPER 2019
19th March 2019
Czech Republic Brno Exhibition Centre
LOPEC 2019
19th March 2019
Germany Messe Munchen
RF & Microwave 2019
20th March 2019
France Paris Expo, Porte de Versailles
ADAS Sensors 2019
20th March 2019
United States of America Detroit, Michigan
Anti-Counterfeiting Forum 2019
20th March 2019
United Kingdom Farnborough, Hampshire