Murata’s long lead thermistor gains automotive qualifications

Murata’s Thermo-String long lead thermistor range for monitoring the temperature of areas that are hard to reach with surface-mount thermistors is now fully qualified for automotive use. Hot spots may not always be on the PCB or motherboard, so Thermo-String’s long leads of up to 150mm allow the head of the thermistor to be situated as close to the problem area as possible, even in narrow or small locations.

The NXF series of Thermo-String thermistors includes Murata’s industry-leading NCP15-series NTC (Negative Temperature Coefficient) chip thermistor in its head. 33 different resistance values are available for maximum design flexibility. The NXF series of Thermo-String thermistors operate in the temperature range -40 to +150°C (NXFS series) and are RoHS, ELV and AEC-Q200 compliant and halogen free. These certifications are required for Thermo-String’s use in the automotive industry. Thermo-String thermistors also provide flexibility benefits to battery cell, PC, power tool, power supply, measurement equipment, heating system and sensor product makers.

Murata’s Thermo-String range also features PTC (Positive Temperature Coefficient) thermistors, the PXF series. These feature the same long leads, with 25 to 150mm lengths available, and are suitable for commercial grade electronics. These PTC thermistors have a unique capability whereby connection in a simple series circuit means one circuit can monitor many different hot spots in a design. The PXF series operates over the range -40 to +125°C.

Keep Up to Date with the Most Important News

By pressing the Subscribe button, you confirm that you have read and are agreeing to our Privacy Policy and Terms of Use
Previous Post

Infolytica Releases MotorSolve v2.2 for Induction Machines

Next Post

Single Output 20W Power Supplies from SL Power Combine Low Cost with High Reliability