ITT ICS Regional Sales Manager, Tony Shoemaker, had built up excellent customer relationships with a number of geothermal companies in the Nevada region and worked on several dozen similar geothermal well installations in the area. More, ITT Interconnect Solutions’ BIW connectors are well-regarded by pump equipment suppliers, including Baker Hughes Centrilift, who supplied Peppermill’s pump and related equipment.
Tony Shoemaker visited the customer prior to the installation to assist in achieving the optimal layout of the cellar in which the equipment is installed. ITT ICS’s BIW team then closely managed the delivery to ensure that equipment arrived while the installation rig was on site. ITT ICS’s BIW Wellhead Feedthru Connector and BIW Surface Power Connector are used to supply electrical power to the electric submersible pump in the well which delivers hot water from the underground formation to the Resort. The 4,400 ft. deep well, which went live in January of this year, produces an excellent flow rate, pressure and fluid temperature, which exceeded initial expectations and requirements.